Massachusetts Estuaries Project Reports
Massachusetts Estuaries Project Re-evaluation Final Report (Stage Harbor System, Bucks Creek System and Taylors Pond System), February 2007 (PDF) Massachusetts Estuaries Project Final Report for Pleasant Bay, May 2006 Massachusetts Estuaries Project Final Report (Stage Harbor System, Bucks Creek System, Talors Pond System, Bassing Harbor System and Muddy Creek), December 2003 Massachusetts Estuaries Project Final Report, December 2003, Response to Comments (PDF) Massachusetts Estuaries Project website Presentation to CAC on Preliminary Draft CWMP/DEIR, August 16, 2007 (PDF) This is a PDF file of a PowerPoint presentation, due to the graphics it may be slow to load on some systems.Presentation made at Cape Cod Commission/MEPA Public Hearing on May 22, 2008 (PDF) This is a PDF file of a PowerPoint presentation, due to the graphics it may be slow to load on some systems.Comprehensive Wastewater Management Plan Final Needs Assessment Report, August 1999 Appendix 1-1: Project Scope and Work Plan (PDF) This Project Scope and Work Plan is from Appendix 1-1 of the Draft Supplemental Needs Assessment Report that was not finalized (it has been superseded by the Draft CWMP/EIR to be issued in summer 2007). The Scope as presented in Appendix 1-1 is adapted from the original project scope issued in 1997.Other Resources
[]
Slideshow Left Arrow
Slideshow Right Arrow